Guide: On December 22, CNOOC Tianjin Branch learned that the commissioning of the first domestic small gas turbine in Qinhuangdao 32-6 Oilfield, China's first offshore intelligent oil field, took 60 days to complete, and it was successfully connected to the grid for power generation, breaking the record of the shortest running time for domestic and foreign gas turbines to be installed and commissioned on China's offshore platforms. Up to now, all system equipment of the unit have been running smoothly, and all main operating parameters are qualified.
The domestic small gas turbine uses the associated gas produced by offshore oil fields to generate electricity, making full use of the natural gas that was previously limited to treatment facilities and could not be exported, realizing the triple benefit of protecting the ecological environment, avoiding resource waste and creating economic benefits. It is an important practice of implementing the green and low-carbon development strategy in Bohai Oilfield, the largest raw oil production base in China, and a practical measure in response to the national call for "double carbon", It has made a key attempt for China's offshore oil and gas production platform to speed up energy conservation and emission reduction, clean production, quality and efficiency improvement.
It is reported that after the unit is put into operation, the annual recovery of vented natural gas will reach about 6.732 million cubic meters, reducing carbon emissions by 126 thousand tons, and saving more than 12 million yuan of purchased electricity.
In the future, Bohai Oilfield will adhere to the green and low-carbon development strategy, effectively improve the utilization rate of clean energy, fully promote both production and environmental protection, and firmly realize higher level and higher quality development.